English |Dutch en | nl

Workshop Drawings for Dock Gates

High quality dry dock

The customer had a clear vision of what was needed: "Give us a functional building with the look and feel of a showroom and a museum-like climate". For this project Iv-Consult was responsible among other things for the dry dock with its foundations, the main dock gate and an intermediate gate as well as preparing the workshop drawings. The dock is equipped with a self-floating trapezium-shaped gate. The double-retaining gate is designed to handle a water level difference of 10.5 metres.
Would you like to know more about the possibilities for your project? Wouter will be pleased to share ideas about your engineering issues. Contact him by email or call 088 943 3100.
We are always on the lookout for new talent. How can you strengthen our team? Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism!
D2605D5B-18C7-4314-ACCB-29BA3C99A8E4Created with sketchtool.