A pragmatic approach to short notice quay repair
Substantial subsidence of the street paving behind the quay wall alongside Slagveld in Brielle meant that the wooden sheet piling was no longer retaining the ground. There were open spaces between the planks and boards were partially rotten, causing leaching. The municipality of Brielle wanted to quickly restore the situation whilst maintaining the existing basalt wall. Iv-Infra advised on possible measures for repairing the quay wall, and as an independent consultant drafted the building team agreement for the implementation and provided the reviews on the products of the building team.