English |Dutch en | nl

The Halfweg Locks

Increasing the water capacity of a monumental lock complex

The monumental lock complex in Halfweg is crucial for the water management of the Haarlemmermeer. The complex has been around for seven centuries and therefore has a historic function as well as being a tourist attraction. The complex consists of three locks with two islands in between. The District Water Control Board of Rhineland has the task of increasing the transit capacity of the lock complex at the eastern lock island. Iv-Infra is hereby drawing up the UAV-GC contract, which includes the architectural design of a new bicycle/pedestrian bridge.
Would you like to know more about the possibilities for your project? Tom will be pleased to share ideas about your engineering issues. Contact him by email or call 088 943 3200.
We are always on the lookout for new talent. How can you strengthen our team? Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism!