English |Dutch en | nl

Wastewater Treatment Plant in Schelluinen

Convincing with foundation

The Rivierenland Water Board wanted to optimise sludge processing in a part of its catchment area with a central sludge processing facility. Iv-Water made the preliminary design for this, whereby sludge is pre-treated based on thermal pressure hydrolysis. Extensive consideration was given to achieving minimal environmental impact, effective integration into the landscape and the guaranteeing of (external) safety. Because the land-use plan did not provide scope for the intended facility, Iv-Water drew up a plan in which the effect of central sludge processing on the environment and society was made transparent.
Would you like to know more about the possibilities for your project? Iwan will be pleased to share ideas about your engineering issues. Contact him by email or call 088 943 3900.
We are always on the lookout for new talent. How can you strengthen our team? Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism!