South West Branch of OV SAAL

Substantial rail expansion between Schiphol and Lelystad

It is expected that by 2030, around 80,000 train passengers per day will make use of the railway between Schiphol-Amsterdam-Almere-Lelystad. The existing track was unable to cope with this substantial capacity growth, thus, considerably expanding the rail capacity on the south side of Amsterdam was needed. In addition to adapting the track, various civil engineering works have been realised, such as a 700-metre-long fly-over and a movable railway bridge. Iv-Infra provided the risk-controlled external quality assurance for the civil engineering, rail and the water management.
Would you like to know more about the possibilities for your project? Joey will be pleased to share ideas about your engineering issues. Contact him by email or call 088 943 3200.
We are always on the lookout for new talent. How can you strengthen our team? Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism!
D2605D5B-18C7-4314-ACCB-29BA3C99A8E4Created with sketchtool.