English |Dutch en | nl

Conversion FPSO Petrojarl I

Seeking solutions outside the boundaries

FPSO Petrojarl I has undergone a complete modification to be able to process the heavy crude oil from the Atlanta field off the coast of Brazil. The new layout is completely different: more than 50% of the process facilities on board have been replaced. Since most of the equipment was replaced by considerably larger equipment, and new equipment was added, solutions outside the boundaries had to be sought. In addition, the FPSO now had to comply with Brazilian regulation, while it was originally designed for the North Sea. Nevesbu and Iv-Offshore & Energy were responsible for a major part of the engineering and handled the procurement of all necessary equipment.

Technical data

Dimensions:
215 x 32m

Weight:
31,473 T

Capacity: 180,000 barrels
Would you like to know more about the possibilities for your project? Albert will be pleased to share ideas about your engineering issues. Contact him by email or call 088 943 3400.
We are always on the lookout for new talent. How can you strengthen our team? Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism!
D2605D5B-18C7-4314-ACCB-29BA3C99A8E4Created with sketchtool.