English |Dutch en | nl

New Lock, Terneuzen

As long and wide as the renewed locks of the Panama Canal

The new lock in Terneuzen will be 427 metres long, 55 metres wide and 16.44 metres deep. This enormous lock will be built within the existing lock complex in Terneuzen and will ensure better access and smoother flow from the Westerschelde to the Ghent Canal and further to Terneuzen and beyond. The arrival of the new lock will allow larger seagoing vessels to sail to the port of Ghent via the Ghent-Terneuzen Canal. For this project, Iv-Infra has been involved with designing the lock gates and the movement mechanism.
Would you like to know more about the possibilities for your project? Wouter will be pleased to share ideas about your engineering issues. Contact him by email or call 088 943 3200.
We are always on the lookout for new talent. How can you strengthen our team? Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism! 
D2605D5B-18C7-4314-ACCB-29BA3C99A8E4Created with sketchtool.