English |Dutch en | nl

New Innovation Centre and Loading Bay

New innovation centre and loading bay

This innovation centre accommodates laboratories, offices, a pilot plant and an enclosed loading bay. The loading bay is large enough to hygienically load six lorries simultaneously with vegetable oil. Loading occurs in a nitrogen atmosphere. A pigging system minimises the product losses in the production pipelines, which minimises contamination of different products. Iv-Industrie handled the integral design process, the feasibility study and the conceptual design all the way through to supervising work in progress and delivery. Food safety was an important factor throughout the design process. For that reason HACCP received extra attention.
Would you like to know more about the possibilities for your project? Ralf will be pleased to share ideas about your engineering issues. Contact him by email or call 088 943 3700.
We are always on the lookout for new talent. How can you strengthen our team? Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism!