Integral Design for Neherkade

30% less concrete required thanks to smart integral design

The new tunnel on the Neherkade in Den Haag was built in an extremely short space of time. Iv-Infra composed the integral, sustainable design of the new tunnel. Thanks to this design, 30% less concrete was required than in the original reference design. Because the implementation was planned shortly after the design phase, the integral design was designed in a Building Information Model (BIM) giving full control over the design in relation to the tight implementation planning.
Would you like to know more about the possibilities for your project? Jacqueline will be pleased to share ideas about your engineering issues. Contact her by email or call​ 088 943 3200.
We are always on the lookout for new talent. How can you strengthen our team? Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism!
D2605D5B-18C7-4314-ACCB-29BA3C99A8E4Created with sketchtool.