English |Dutch en | nl

Installation of Highly Purified Water

New plant saves approximately 185,000 m3 of gas per year

A large amount of energy is used in the production of water for injection (WFI). Energy consumption can be significantly reduced by replacing a substantial part of the WFI water consumption with highly purified water (HPW). Due to expansion of production and the overall increase in production, this client decided to purchase a new HPW system, which will significantly reduce the future growth of energy consumption. Iv-Industrie managed the mechanical engineering discipline for this new installation, supervised the engineering and organised the installation work.
Would you like to know more about the possibilities for your project? Ralf will be pleased to share ideas about your engineering issues. Contact him by email or call​ 088 943 3700.
We are always on the lookout for new talent. How can you strengthen our team? Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism!
D2605D5B-18C7-4314-ACCB-29BA3C99A8E4Created with sketchtool.