Replacement of hydrogen production installations
The client is a global producer and supplier of various types of hydrogen with a high degree of purity. A new-build was required due to the outdated installations and the wish to relocate the production unit to a different city. The new-build consists of a drum and storage area, a drum installation, a bleaching and steam plants, a tank farm consisting of insulated stainless steel tanks, a dosage building, a truck loading area and specific piping. For this client Iv-Industrie performed the E&I, piping & mechanical engineering and project management.