English |Dutch en | nl

Production Facility IHC Sliedrecht

Complete redesign of existing production halls in a short period of time

In sliedrecht, an existing location has been cleared and converted into the head office and primary production site of IHC IQIP, whereby four IHC business units have been merged. The combined area of the existing production halls is approximately 22,000 m2 and has been completely refurbished, structurally adapted and equipped with various installations. The office section has been converted according to current standards for climate control systems, lighting and network infrastructure. The greatest challenge of this project was the extreme time pressure. In a short period of time, the layout of the work halls was designed, and all necessary facilities were prepared. Iv-Bouw developed the technical installations.

Technical data

Client: Royal Merwede Holding B.V.
Phases: preliminary design, final design and implementation

Surface area:
Workplace: 15.000 m²
Office: 3.000 m²

 
Would you like to know more about the possibilities for your project? Erik will be pleased to share ideas about your engineering issues. Contact him by email or call 088 943 3500.
We are always on the lookout for new talent. How can you strengthen our team? Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism!