English |Dutch en | nl

Stinger Pioneering Spirit

Stinger of immense pipe-laying ship

Pioneering Spirit of Allseas is a vessel designed for dismantling old offshore oil and gas platforms and laying pipelines at great depths and is also designed to install platforms. Part of the ship is the approximately 210-metre long stinger, consisting of the Stinger Transition Frame and three separate parts, each with a length of roughly 50 metres. Even under severe weather conditions, Pioneering Spirit can continue doing its work. Iv-Consult contributed to the design of the stinger.  

Technical data

Dimensions
382m long
124m wide

Weight
Topside: 24,000 T
Would you like to know more about the possibilities for your project? Jaco will be pleased to share ideas about your engineering issues. Contact him by email or call 088 943 3100.
We are always on the lookout for new talent. How can you strengthen our team? Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism!