Worldwide engineering and construction
The Alba B3 Compression Platform is installed in the Alba gas and condensate field. This is located approximately 32 kilometres north of the capital Malabo on the island of Bioko. A complex project, for which work has been performed at various locations worldwide. The platform was designed in the Netherlands and America and constructed in the Netherlands and Equatorial Guinea. As partners in a joint venture, Iv-Offshore & Energy and Heerema Fabrication Group have jointly implemented the engineering, procurement and construction (EPC).