English |Dutch en | nl

A12 Veenendaal-Ede

Improved traffic flow, accessibility and safety on the A12

A rush-hour lane and three weaving lanes in both directions on the A12 motorway between Veenendaal and Ede-Wageningen were needed in order to provide a better flow of traffic, improve regional accessibility and enhance road safety. A number of bridges were also replaced, ecological and fauna provisions provided, a tunnel lengthened, noise abatement facilities installed and traffic signalling placed above the motorway. Iv-Infra provided the entire package of surveying work and was responsible for part of the road design, including water management and a greenery plan.
Would you like to know more about the possibilities for your project? Wouter will be pleased to share ideas about your engineering issues. Contact him by email or call 088 943 3200.
We are always on the lookout for new talent. How can you strengthen our team? Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism!