Engineers with Passion for Technology
Headquarters
Iv-Groep b.v.
Noordhoek 37
3351 LD Papendrecht
The Netherlands
+31 88 943 3000
info@iv-groep.n
l
All Iv locations
Markets
Buildings & Installations
Architects
Contractors
Commercial Companies
Data Centres
Educational Institutions
Government Institutions
Project Developers
Public Transport Companies
Healthcare Institutions
All about Buildings & Installations
Handling
Storage and Transhipment
Shipyards
Steel Construction Companies
T&I Contractors
All about Handling
Industry
Chemical Producers
Pharmaceutical Producers
Food Manufacturers
Tank Terminals
All about Industry
Infrastructure & Traffic
Contractors
Architects
Municipalities
Port Companies
Provinces
Rijkswaterstaat
Rail Infrastructure Managers
Steel Construction Companies
Water Boards
All about Infrastructure & Traffic
Maritime
Defence Organisations
Energy Companies
Knowledge Institutions
Marine Operators/Owners
Mission System Suppliers
Offshore (FPSO) Contractors
Shipyards
All about Maritime
Offshore & Energy
Contractors
Energy Companies
Grid Operators
Operators
T&I Contractors
All about Offshore & Energy
Water
Contractors
Drinking Water Companies
Municipalities
Industry
Rijkswaterstaat
Water Boards Water Quality
Water Boards Water Safety
All about Water
News
Vacancies
About Iv
Projects
Facts & Figures
Working on the toughest challenges
Our DNA
Specialist in steel and mechanical engineering
Sustainability & Innovation
The Dutch Engineering Experience
Vacancies
Contact
English
|
Dutch
en |
nl
Home
>
Working on the toughest challenges
>
Vacancies
Zoeken
Back to News
Iv-Infra selected as design partner in megaproject SAA A9
Iv-Infra
Bascule bridge
Civil Engineering Works
Design partner for the ‘East and West Package’
The A9 Badhoevedorp-Holendrecht project can rightfully be called a megaproject. The Directorate-General for Public Works and Water Management (Rijkswaterstaat) awarded the project to the VEENIX consortium consisting of Macquarie Capital, Siemens, Count & Cooper and FCC Construcción. VEENIX is responsible for the design work, construction and the pre-financing (DBFM) of the project. Iv-Infra is a selected design partner for the ‘East and West Package’ and will be commissioned by FCC Construcción to create the preliminary design and final design for the new Schiphol Bridge (movable bridge), a number of viaducts and a new underpass.
Complex engineering work
One of the most challenging and complex parts of the project and the scope of Iv-Infra concerns the new Schiphol Bridge. The existing Schiphol Bridge will be reused and widened for the civil components. This is how the bascule chamber will be adapted and widened. The bridge will receive new electrotechnical and mechanical installations, a new control tower and two new bridge decks.
Very excited about this mega job
David van Goolen, Project Manager at Iv-Infra: “This project is challenging on all fronts. And since we like challenges and technical complexity at Iv, we are very excited about being involved in this mega job. The challenges lie not only on a technical level but also in design planning, collaborating with other design partners under FCC and the conditions under which Iv-Infra will be contracted. There is, therefore, a strong focus on project management. This is also the first time that Iv-Infra has appointed a steering committee to oversee the project.”
If you like to know more about the A9 Badhoevedorp-Holendrecht project, please check out
Rijkswaterstaat's
website.
Name:
Email address:
Message:
We are always on the lookout for new talent. How can you strengthen our team?
Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism!
Check our vacancies