Engineers with Passion for Technology
Headquarters
Iv-Groep b.v.
Noordhoek 37
3351 LD Papendrecht
The Netherlands
+31 88 943 3000
info@iv-groep.n
l
All Iv locations
Markets
Buildings & Installations
Architects
Contractors
Commercial Companies
Data Centres
Educational Institutions
Government Institutions
Project Developers
Public Transport Companies
Healthcare Institutions
All about Buildings & Installations
Handling
Storage and Transhipment
Shipyards
Steel Construction Companies
T&I Contractors
All about Handling
Industry
Chemical Producers
Pharmaceutical Producers
Food Manufacturers
Tank Terminals
All about Industry
Infrastructure & Traffic
Contractors
Architects
Municipalities
Port Companies
Provinces
Rijkswaterstaat
Rail Infrastructure Managers
Steel Construction Companies
Water Boards
All about Infrastructure & Traffic
Maritime
Defence Organisations
Energy Companies
Knowledge Institutions
Marine Operators/Owners
Mission System Suppliers
Offshore (FPSO) Contractors
Shipyards
All about Maritime
Offshore & Energy
Contractors
Energy Companies
Grid Operators
Operators
T&I Contractors
All about Offshore & Energy
Water
Contractors
Drinking Water Companies
Municipalities
Industry
Rijkswaterstaat
Water Boards Water Quality
Water Boards Water Safety
All about Water
News
Vacancies
About Iv
Projects
Facts & Figures
Working on the toughest challenges
Our DNA
Specialist in steel and mechanical engineering
Sustainability & Innovation
The Dutch Engineering Experience
Vacancies
Contact
English
|
Dutch
en |
nl
Home
>
Working on the toughest challenges
>
Vacancies
Zoeken
Back to News
Steel movable deck Prinses Amalia bridge jacked into position
Iv-Infra
Bascule bridge
Engineering
Placement
A total weight of 272 tonnes
The new Princess Amalia Bridge on the N246 at Westknollendam (municipality of Zaanstad) offers enough surface capacity for two traffic lanes and a 3-metre wide cycle lane. After the summer, this bridge will be used as a replacement for the old Beatrix Bridge. The reason why the name has been changed is that there is another Beatrix Bridge (also in the municipality of Zaanstad) which is only a few kilometres away.
During the night of 12 to 13 April, the steel movable deck of the brand-new Princess Amalia Bridge was jacked into position on the N246 from the water. The placement of the movable deck, including the counterweight comprised a total weight of 272 tonnes during the jacking operation. The ballast was placed in the counterweight on Saturday and was welded shut on Sunday. The operating mechanisms were then connected to the movable deck. During the night of Sunday to Monday, the movable deck was finally opened and secured to the locking device to resume shipping. In the coming period, the roof of the bascule chamber will be installed, equipment placed, and the bridge further completed. Iv-Infra took care of, among other things, the final design of the steel structure, the mechanical equipment, the guidance structure and waiting areas. In addition, Iv-Infra was responsible for the final design and the implementation design of the concrete ramps, the bascule chamber and the foundations.
Would you like to know more about this project?
Contact Pieter by e-mail or call
088 943 3200
.
Send Pieter an e-mail
We are always on the lookout for new talent. How can you strengthen our team?
Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism!
Check our vacancies
Name:
Email address:
Message: