Engineers with Passion for Technology
Headquarters
Iv-Groep b.v.
Noordhoek 37
3351 LD Papendrecht
The Netherlands
+31 88 943 3000
info@iv-groep.n
l
All Iv locations
Markets
Buildings & Installations
Architects
Contractors
Commercial Companies
Data Centres
Educational Institutions
Government Institutions
Project Developers
Public Transport Companies
Healthcare Institutions
All about Buildings & Installations
Handling
Storage and Transhipment
Shipyards
Steel Construction Companies
T&I Contractors
All about Handling
Industry
Chemical Producers
Pharmaceutical Producers
Food Manufacturers
Tank Terminals
All about Industry
Infrastructure & Traffic
Contractors
Architects
Municipalities
Port Companies
Provinces
Rijkswaterstaat
Rail Infrastructure Managers
Steel Construction Companies
Water Boards
All about Infrastructure & Traffic
Maritime
Defence Organisations
Energy Companies
Knowledge Institutions
Marine Operators/Owners
Mission System Suppliers
Offshore (FPSO) Contractors
Shipyards
All about Maritime
Offshore & Energy
Contractors
Energy Companies
Grid Operators
Operators
T&I Contractors
All about Offshore & Energy
Water
Contractors
Drinking Water Companies
Municipalities
Industry
Rijkswaterstaat
Water Boards Water Quality
Water Boards Water Safety
All about Water
News
Vacancies
About Iv
Projects
Facts & Figures
Working on the toughest challenges
Our DNA
Specialist in steel and mechanical engineering
Sustainability & Innovation
The Dutch Engineering Experience
Vacancies
Contact
English
|
Dutch
en |
nl
Home
>
About Iv
>
Projects
>
Södertälje
Zoeken
Back to News
Iv-Offshore & Energy signs early works contract engineering Sofia HVDC Platform
Iv-Offshore & Energy
Iv-Offshore & Energy, Dutch engineering company at its best
Iv-Offshore & Energy b.v. is proud to announce that it has signed the early works contract with Sembcorp Marine Offshore Platforms Pte Ltd (SMOP) for the engineering of the Sofia high voltage direct current (HVDC) platform (10,000 T). Sofia Offshore Wind Farm will be one of the largest offshore wind farms in the world and when operational could provide almost 1.2 million UK homes with their annual electricity needs. Iv-Offshore & Energy is SMOP’s engineering subcontractor for the balance of plant installation in this endeavor and shall provide detailed design for both the topside and jacket and procurement of topside equipment.
A great leap forward in the world of the offshore HVDC engineering
Sofia Offshore Wind Farm will consist of 100 wind turbines, with a total installed capacity of 1,400 MW. The offshore converter platform will convert the electricity generated by the turbines from 66 kilovolts (kV) alternating current (AC) up to 320kV direct current (DC) before transmission to shore. In 2018 UK Grid Solutions Ltd (GE) and Iv-Offshore & Energy completed a FEED study for the proposed Sofia HVDC platform.
For Iv-Offshore & Energy the contract is a great leap forward in the world of the offshore HVDC engineering. We have planted our flag in this sector through our involvement starting with Borwin Alpha (400 MW) followed by Dolwin Alpha (800 MW) and Helwin Béta (690 MW) platforms and various engineering and design studies such as the 2 GW offshore grid connection FEED for TenneT. We are honored to add the Sofia platform to our HVDC experience list. We take our leading position within this sector with pride, knowing that we have reached this level of success because of our vast experience, unequaled competence and our excellent past performance.
Sofia Offshore Wind Farm Project Details
Sofia is the largest project in RWE Renewable’s current development portfolio with a generating capacity of up to 1.4 gigawatts (GW). The wind farm site is located 195 km off the coast of the North East of England and on the shallow central area of the North Sea known as Dogger Bank.
During the last ice age the bank was part of a large landmass connecting Europe and the British Isles.
In 2015 the UK Secretary of State awarded development consent orders to four offshore wind projects to be sited on Dogger Bank, including Dogger Bank Teesside B, now called Sofia. Construction of the wind farm is due to begin onshore at its Teesside converter station site early next year, with offshore construction expected to get underway in 2023.
Dutch engineering company Iv-Offshore & Energy is a subsidiary of Iv-Groep and is already successful in the offshore wind energy for many years. We are proud to contribute our technical knowledge to further the development of sustainable energy.
Would you like to know more about this project or our offshore energy services?
Fedor will be pleased to tell you more. Please contact him via
088 943
2802
or send an email.
Send Fedor an email
Name:
Email address:
Message:
We are always on the lookout for new talent. How can you strengthen our team?
Working at Iv means working on challenging and varied projects every day. At the office or on location. Check now to see if you can find an exciting challenge within your specialism!
Check our vacancies